New floor area that works properly
Joined-up layouts
We consider the opening, circulation and room use on both sides of the new wall.
Weatherproof stages
The structure is sequenced to protect internal fitting as the shell closes in.
Broader work combined
Renovation and reconfiguration can be planned alongside the added floor area.
Add space that connects with your home
An extension should solve a real shortage of space, not leave you with a new room that feels detached from the old layout. We discuss how you intend to use it, where people will enter and how daylight, views and circulation should work. The scheme might create a larger kitchen, a new bedroom or a sunroom, but each option brings different structural and service needs. We can carry the work from prepared design information through groundwork, structure, a weatherproof shell, internal services and final finishes.


Settle feasibility before breaking ground
Planning permission, permitted development, building regulations and structural design can all affect the route forward. The relevant professional advice and approvals need to be in place before construction reaches those stages. We review access, ground conditions, connections to the existing building and material movement when preparing the job. Where an extension forms part of a wider renovation, we coordinate openings, services and finishes so old and new areas are completed in a sensible order.
Frequently asked questions
Do we need planning permission for an extension?
It depends on the property's history, location and proposed size and design. Some schemes may fall under permitted development, while others need an application. You should confirm the correct route before work starts.
Can you build from drawings we already have?
Yes, provided the drawings and supporting structural information are suitable for construction and the necessary approvals are in place. We review the documents against site conditions before agreeing the scope and quotation.
Can we stay in the house during extension work?
That depends on access, service interruptions and how much of the existing interior is affected. We discuss separation, safe entry and key connection stages with you before work begins, so the practical impact is clear.

